Barraza, G A, Back, W E and Mata, F (2004) Probabilistic Forecasting of Project Performance Using Stochastic S Curves. Journal of Construction Engineering and Management, 130(01), 25–32.

Bonnal, P, Gourc, D and Lacoste, G (2004) Where Do We Stand with Fuzzy Project Scheduling?. Journal of Construction Engineering and Management, 130(01), 114–23.

Chan, A P C, Scott, D and Chan, A P L (2004) Factors Affecting the Success of a Construction Project. Journal of Construction Engineering and Management, 130(01), 153–5.

Cho, Y, Haas, C T, Sreenivasan, S V and Liapi, K (2004) Position Error Modeling for Automated Construction Manipulators. Journal of Construction Engineering and Management, 130(01), 50–58.

Deng, X, Ding, S and Tian, Q (2004) Reasons underlying a mandatory high penalty construction contract bonding system. Journal of Construction Engineering and Management, 130(01), 67–74.

Dikmen, I and Birgonul, M T (2004) Neural Network Model to Support International Market Entry Decisions. Journal of Construction Engineering and Management, 130(01), 59–66.

Dzeng, R J, Wang, W C and Tserng, H P (2004) Module-Based Construction Schedule Administration for Public Infrastructure Agencies. Journal of Construction Engineering and Management, 130(01), 5–14.

Elazouni, A M and Gab-Allah, A A (2004) Finance-Based Scheduling of Construction Projects Using Integer Programming. Journal of Construction Engineering and Management, 130(01), 15–24.

  • Type: Journal Article
  • Keywords: Scheduling; Computer programming; Construction industry; scheduling; construction industry; civil engineering; programming;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(2004)130:1(15)
  • Abstract:
    Construction scheduling is the process of devising schemes for sequencing activities. A realistic schedule fulfills the real concerns of users, thus minimizing the chances of schedule failure. The minimization of total project duration has been the concept underlying critical-path method/program evaluation and review technique (CPM/PERT) schedules. Subsequently, techniques including resource management and time-cost trade-off analysis were developed to customize CPM/PERT schedules in order to fulfill users’ concerns regarding project resources, cost, and time. However, financing construction activities throughout the course of the project is another crucial concern that must be properly treated otherwise, nonrealistic schedules are to be anticipated. Unless contractors manage to procure adequate cash to keep construction work running according to schedule, the pace of work will definitely be relaxed. Therefore, always keeping scheduled activities in balance with available cash is a potential contribution to producing realistic schedules. This paper introduces an integer-programming finance-based scheduling method to produce financially feasible schedules that balance the financing requirements of activities at any period with the cash available during that same period. The proposed method offers twofold benefits of minimizing total project duration and fulfilling finance availability constraints.

Ford, D N, Anderson, S D, Damron, A J, de Las Casas, R, Gokmen, N and Kuennen, S T (2004) Managing Constructibility Reviews to Reduce Highway Project Durations. Journal of Construction Engineering and Management, 130(01), 33–42.

Goodrum, P M and Haas, C T (2004) Long-Term Impact of Equipment Technology on Labor Productivity in the U.S. Construction Industry at the Activity Level. Journal of Construction Engineering and Management, 130(01), 124–33.

Hauck, A J, Walker, D H T, Hampson, K D and Peters, R J (2004) Project Alliancing at National Museum of Australia—Collaborative Process. Journal of Construction Engineering and Management, 130(01), 143–52.

Ho, S P and Liu, L Y (2004) Analytical Model for Analyzing Construction Claims and Opportunistic Bidding. Journal of Construction Engineering and Management, 130(01), 94–104.

Ling, F Y Y, Chan, S L, Chong, E and Ee, L P (2004) Predicting Performance of Design-Build and Design-Bid-Build Projects. Journal of Construction Engineering and Management, 130(01), 75–83.

Marzouk, M and Moselhi, O (2004) Multiobjective Optimization of Earthmoving Operations. Journal of Construction Engineering and Management, 130(01), 105–13.

Shapira, A (2004) Work Inputs and Related Economic Aspects of Multitier Shoring Towers. Journal of Construction Engineering and Management, 130(01), 134–42.

Shr, J and Chen, W T (2004) Setting Maximum Incentive for Incentive/Disincentive Contracts for Highway Projects. Journal of Construction Engineering and Management, 130(01), 84–93.

Treloar, G J, Love, P E D and Crawford, R H (2004) Hybrid Life-Cycle Inventory for Road Construction and Use. Journal of Construction Engineering and Management, 130(01), 43–49.